Fire from distillation column rupture
Initiating Event Multiple
Scenario Fire from distillation column rupture
Target likelihood 1.00E-08
Cause(s) of Initiating Event Likelihood of each cause (per year) General Protection design BCPS Alarms etc. Additional Mitigation IPL additional mitigation dikes, pressure relieve Mitigated Event frequency % Contribution
Loss of cooling water 1.00000E-01   DCS  OP Alarm   Rupture disk 1.00000E-06 9.09%
1.00000E-01 1.00000E-01 1.00000E-01 1.00000E-01 1.00000E-01
Steam control loop failure 1.00000E-01   OP Alarm Rupture disk 1.00000E-05 90.91%
1.00000E-01 1.00000E+00 1.00000E-01 1.00000E-01 1.00000E-01
2.00000E-01
2.00000E-01
1.10000E+00 2.00000E-01 2.00000E-01 2.00000E-01 1.10000E-05 100.00%
Total Cause Probability 2.00000E-01
Mitigated Probability 1.10000E-05
PFD 5.50000E-05
Reduction 18181.82
Equivalent SIL level 4
SIF reduction 9.09E-04
SIF SIL level 0